1 minute reading time (146 words)

Azure Power commissions SECI’s 300 MW ISTS solar project in Bhadla, Rajasthan

Image for representation only

Azure Power has announced the full commissioning of its 300 MWs Interstate Transmission System (ISTS) connected solar power project, Rajasthan 8, allocated by Solar Energy Corporation of India (SECI).

The project is in Bhadla, Rajasthan and the power generated from the project is being supplied to SECI at a tariff of 2.58 (~US 3.7 cents) per kWh for 25 years.

Following this, Azure Power has now operationalized 2,683 MWs of high-performing renewable energy assets in India.

"We are extremely delighted with the progress we have made in operationalizing our under-construction projects, despite the health and supply chain challenges in the last two years. We have operationalized close to 700 MWs in this fiscal year so far, which reflects our strong project development and execution capabilities," states Ranjit Gupta, MD, and CEO, Azure Power. 

Author : Debi Dash
Volkswagen, Ford expand collaboration on MEB elect...
CSIR-CMERI develops the world’s largest solar tree...
arrow_upward